工地误差大的墙面采用独特的定点充筋工艺:
以800-1500mm的距离为定点位置,取最高点,以此为基础,将墙面分段充筋,做到整体找平
后期安装门口、踢脚线、衣柜全部都是严丝合缝的
特别声明:以上内容(如有图片或视频亦包括在内)为自媒体平台“网易号”用户上传并发布,本平台仅提供信息存储服务。
Notice: The content above (including the pictures and videos if any) is uploaded and posted by a user of NetEase Hao, which is a social media platform and only provides information storage services.