The Sanmenxia Hydroelectric Project has increased its discharge flow to 2,800 cubic meters per second to support the 2025 Yellow River water and sediment regulation, creating a high-flow process to scour sediment deposits in the river channel and assist the Xiaolangdi Reservoir in flushing out sand.
#explore#construction#environment
By Wang Yu, Wang Ziyuan, Fan Xizhuo(Intern) and Du Jie / China Youth Daily
来源:中国青年报客户端
特别声明:以上内容(如有图片或视频亦包括在内)为自媒体平台“网易号”用户上传并发布,本平台仅提供信息存储服务。
Notice: The content above (including the pictures and videos if any) is uploaded and posted by a user of NetEase Hao, which is a social media platform and only provides information storage services.